PsiQuantum said this on 2024-04-29. The Ledger scores it on 2027-12-31, against criteria fixed on 2026-09-23.
Tracking
PsiQuantum is on an aggressive plan to have the site operational by the end of 2027.
press release, PsiQuantum, 2024-04-29
"Operational" is read as the quantum computer on the site running computations, not the building being finished. Resolves VERIFIED if, by 31 Dec 2027 (plus grace), PsiQuantum's system at the Brisbane site is running computations, confirmed by PsiQuantum or the Australian or Queensland government plus independent reporting. PARTIALLY_VERIFIED if the facility is complete and a smaller or partial system runs there. NOT_VERIFIED otherwise.
Sources that will settle it: https://www.psiquantum.com/news, https://www.industry.gov.au, https://thequantuminsider.com.
Open this claim in the Ledger, with every other claim and the scorecards. How the Ledger judges a claim.